References
Customer: Gudvangen Stein AS
Period: 2021
Radiocommunication for mining. This customer have installed three basestations in conference to have communcation both Radiocommunication for mining. This customer has installed three base stations in a conference setup to communicate outside and inside the tunnels. The system also has additional wi-fi in specified locations.
Customer: Green Waves AS
Period: 2020-2024
Worked as a consultant in the field of battery and electronics from idea to product in developing electric propulsion systems for small electric leisure boats.
Keyword:
Customer: Fjord Helicopter AS
Period: 2021-
Development of mechatronics for remote control of underhanging equipment used in helicopter operations. In this project, we do electronics design, and mechanical calculations and establish test procedures.
Customer H2 House AS
Period: 2024-
Teaching how to operate both hydrogen electrolysers and fuel cells safely. Development of teaching material and basic lab setup to ensure safe demonstrations.
Customer: Fonnafly AS and VTK
Period: 2020-2021
Development of electronics and mechanics for underhanging timber claws operated by helicopter. Also performed simulation of the sequential hydraulics to make the operation more automated.
Customer: Fonnafly AS
Period: 2011-2013
Development and delivery of two units for control and operate concrete and lime tubs. With these units, the operator can open and close the tub without any modifications to the helicopter.
Legg att eit svar
Du må vere pålogga for å kommentere.